Forces Explained · Why It Fell · No. 3

Punching Shear

Why a Concrete Floor Can Fall All at Once

The video premieres on YouTube on 26 November 2026. The full article is below.

Punching Shear: video thumbnailPremieres 26 November

In June 1995, a five-storey department store in Seoul collapsed in less than twenty seconds. 502 people died. It was not an earthquake, and it was not a bomb. It was a failure most people have never heard of: punching shear.

This video explains what punching shear is, why a flat concrete slab can fail with almost no warning, what exactly went wrong at Sampoong, and how engineers prevent it today.

6:19 · 6 drawings · Watch on YouTube

The full story

Hook

Seoul, the 29th of June, 1995. At 5:52 in the evening, the Sampoong Department Store is full of shoppers. In less than twenty seconds, the main columns fail, and five storeys fall into the basement. 502 people died.

It was not an earthquake, and it was not a bomb. The cause was a kind of failure that most people have never heard of. Engineers call it punching shear.

A floor with no beams

The building had no beams. Its floors were flat slabs: plates of concrete, resting directly on the columns. Flat slabs are used all over the world, in car parks, offices and apartment blocks. They are fast to build, the ceiling is flat, and each storey can be a little lower. And they are perfectly safe, as long as one check is done properly.

Drawing from the video: Punching Shear, figure 1
Fig. 1

A beam gives you a warning. It sags, and it cracks, long before it breaks. A flat slab can fail in a very different way.

What punching is

Around each column, the whole weight of the floor has to pass through a thin ring of concrete. Think of pushing a pencil through a sheet of paper. The paper is fine everywhere, except in the small ring around the tip. In a slab, the concrete breaks along a sloping crack, in the shape of a cone. The column does not break. It stays where it is, and the slab slides down around it.

Drawing from the video: Punching Shear, figure 2
Fig. 2

The strength of that ring depends on two things: how long it is, and how deep it is. A smaller column means a shorter ring. A thinner slab means a shallower ring. Make either of them a little smaller, and the stress in the concrete rises quickly.

And the failure is brittle. There is very little warning, and it happens in a moment. Then comes the worst part. The load that this column was carrying jumps to the columns next to it. Now they are overloaded, and they punch through too. The falling slab lands on the floor below, and that floor was never designed to catch it. Engineers call this a progressive collapse.

Drawing from the video: Punching Shear, figure 3
Fig. 3

How the ring was weakened

Now, back to Seoul. The building was first designed as an apartment block, four storeys high. During construction, the owner decided to turn it into a department store. The contractor refused to make the changes. The owner dismissed them, and used his own company.

Then came the changes, and each one cut into that ring of concrete. The columns were built 60 centimetres wide, where the design asked for 80. Some of them had half of the steel bars they needed. In the slabs, the top steel was placed too low: ten centimetres from the surface, and not five. So the working depth of the slab was smaller. Openings were cut through the slabs for the escalators. And at some columns, the thicker panel of concrete over the column was simply left out.

Drawing from the video: Punching Shear, figure 4
Fig. 4

Then the load went up. A fifth floor was added, and it became a floor of restaurants, with a heavy heated floor made of thick concrete. On the roof stood three cooling units, about fifteen tonnes each. In 1993, after the neighbours complained about the noise, the units were moved to the other side of the roof. They were not lifted by a crane. They were dragged across the slab. Cracks appeared along the way.

The last day

On the morning of the 29th of June, the cracks around one column on the fifth floor grew wider. The floor around it began to sink. There were loud bangs from the roof. Engineers were called in, and they said the building was not safe. The managers closed the top floor, and they turned off the air conditioning. But they did not close the store. At 5:52, the slab punched through.

Drawing from the video: Punching Shear, figure 5
Fig. 5

The last survivor was pulled out after seventeen days. The owner went to prison.

Not only Seoul

This was not a single case. In 1981, in Cocoa Beach, Florida, a five-storey apartment building called Harbour Cay collapsed while the roof was being poured. Eleven workers were killed. The investigation found that the punching check had been left out of the design. The slab was thinner than the code required. And the top steel was sitting too low, on supports that were too short.

Drawing from the video: Punching Shear, figure 6
Fig. 6

In 2021, in Surfside, Florida, part of Champlain Towers South fell in the middle of the night. 98 people died. In June 2026, the federal investigators published their technical findings. In their account, the collapse began in the pool deck, with punching failures where the slab met its columns. They point to weak points in the original design, to heavy planters and paving that were added later, and to forty years of corrosion.

Look at the three stories together, and you see the same pattern. A design with very little margin. Steel that is not where the drawing shows it. And load that somebody added afterwards.

How engineers prevent it

So what do engineers do about it? First, they make the ring bigger: a wider column, a thicker slab, or a thicker panel of concrete just over the column. Second, they add steel that crosses the sloping crack: small vertical studs or links around the column. And third, they run bottom bars straight through the column. These bars do not stop the punching. But if the slab does punch through, it hangs on them, and does not fall onto the floor below.

And there are signs to look for. Cracks on top of the slab, in a ring around a column. A floor that is sinking around a column. In Seoul, those signs were there for hours. The concrete gave its warning. The people in charge did not listen.

This is The Bending Moment. Thank you for watching.

The Guide

How to Read Structural Drawings

One beam, B2, followed from the plan to the section, the schedule and the general notes, then decoded in the six rebar notations you will meet on real sets.

#5H1616ØT16Ø16N16

61 pages · 12 exercises with answers · about 100 abbreviations · PDF

See the guide, $9.90

Sources

  • Sampoong Department Store collapse: Gardner, Huh and Chung (2002); Park (2012)
  • NBS Building Science Series 145: Investigation of Construction Failure of Harbour Cay Condominium (1982)
  • NIST: technical findings on the partial collapse of Champlain Towers South (June 2026)

The narration uses an AI clone of the author's own voice. All drawings are original.

Watch next

All videos →

One structure, explained.
Every week.

A short email with one drawing, one idea and the new video. No noise.

The newsletter opens soon. Meanwhile, subscribe on YouTube.